Respectful integration with the environment

CKK Jordanki is located within a green ring around the historic city center, overlooking the Vistula River. Therefore, special care was took in designing the orientation and height of the volumes so that the presence of the new building establishes a harmonious relationship with the natural and built environment. Thus the building occupies half of the plot, the other half being dedicated to park and the height is kept as low as possible, to avoid blocking the view over the river. The visual effect achieved is that of a natural object, a rock embedded in a gently sloping meadow.

On the other hand, the materiality refers Torun's Gothic legacy, an UNESCO protected city, in which almost all the façades of the old town boast of red brick. CKK Jordanki's outside is made of white concrete in contrast to the cuts in the skin that give a glimpse of the red inner lining, made of crushed brick. The use of brick in Jordanki CKK is a contemporary reinterpretation of the traditional brick, is a reference to Torún's façades, and ultimately to its cultural heritage.

Flexible program

The program is characterized by a great flexibility at such extent that a building, which according to the client's brief, was meant to be only a concerts hall, ended up being a space for all kinds of concerts and events, within the same initial budget. First of all, the theatre space is able to adapt easily to different capacities. For instance you may join two rooms to act as the main theatre by moving the walls and changing the number of the easily removable seats. It is possible to hold several separate and simultaneous events. Secondly, thanks to its dynamic ceiling, the building can be tuned to effectively absorb symphonic performances, chamber, theatre, opera, and film and meet any acoustic requirements the theatre designer requires. Finally, the concert hall can open to the outside, allowing to join the interior stage with the park outside for outdoor performances.

Recycling and innovation: picado

Picado, used in the entire building, is a mix of concrete and other materials. At CKK Jordanki, it was mixed either with reclaimed red bricks from a local factory (Ceramsus) for the sound reflection effect; either with a volcanic reddish stone from China, for its sound absorbtion effect. The picado is an innovative technique, conceived by Fernando Menis, consisting of mixing concrete with other materials and break it afterwards. Besides achieving a rough expression, the picado allows excellent acoustics results. The first time Menis used it, was for Magma Art & Congress (Tenerife, Canary Islands, 2005), by mixing concrete with local volcanic stones. For the CKK Jordanki, the technique has been researched further, tested and certified by the Spanish and the Polish Building Research Institute -ITB, respectively. The red brick is present almost on all the façades of the city and its use in CKK Jordanki is Menis's contemporary reinterpretation of this traditional material while a clear reference to the town's cultural heritage.

Acoustic system

The definition of the auditorium space and of its shapes was made through an interactive process, always in relation to acoustics, until reaching the final shape. The plastic properties of concrete allows its use in concert halls in many different ways because it allows you to control the geometry (liquid stone) and adapt its shape to the formwork so that you can control the first sound reflections the listener received. In addition, the surface treatment of the crushed brick and concrete mix, allowed us a kind of diffusion, very difficult to achieve with other materials.

The moving parts of the auditorium have an area ranging from 80 to 140 m2, having a weight that varies according to the piece, from 11 to 20Tn. Each of the pieces can move independently from 3 to 5 m in height, allowing adjustment of the geometry and volume of the hall, depending on the needs of each moment, transforming a volume of 8200 m3 with a time reverberation of 1.85 seconds, into a volume of 6,800 m3, with a reverberation time reduced down to 1.35 seconds. By adding additional absorption you could reach a reverberation time of 1.2 seconds, which covers the entire range of possible activities: 1.85 seconds for symphonic music, 1.6 seconds for opera and 1.2 seconds for theater.

Bricks

Brick manufacturer: CERAMSUS (http://www.ceramika.pl)

Simple bricks, discarded for failing to meet the standards needed to be marketed, considered waste and evicted, were yet recycled by us as valuable elements for acoustics: Chopped and mixed with concrete, the mixture thus obtained was worked further mechanically to obtain uneven surfaces which, together with the general geometry of the hall, works as a regulating instrument of its acoustics. This technique that we have called "picado" ("chopped") has been certified by the Institute of Construction Research of Spain and Poland and consists essentially of mixing the concrete with other materials with different degrees of sound absorption and then also work it on surface to achieve the appropriate acoustic effects according to the program.

These red bricks have a lower acoustic absorption than wood which makes it a very suitable material for the concert halls, auditoriums and other spaces in which a correct acoustic diffusion of medium as low and acute sound is needed. CKK Jordanki's "picado" opens the possibility for the creative reuse of waste bricks as an acoustic design tool.

Why brick?

The facades in the old town of Torun, the city where CKK Jordanki is located, are red brick. We wanted to honor the Gothic legacy of Torún from the contemporary interpretation of this traditional material. We did this with a new material that combines concrete and recycled brick, which is actually a valuable instrument of acoustic control, an essential function in a Concerts Hall.

Credits

Architect: Fernando Menis
Architects collaborators: Karolina Mysiak, Jaume Cassanyer, Javier Espílez
Collaboratos for draft design stage: José Antonio Franco (Martínez Segovia y asociados) for structure; José Luis Tamayo for stage equipment, Pedro Cerdá for acoustics.
Team in Poland: Jacek Lenart (STUDIO A4 Spółka Projektowa z o.o.) Supervising Architect; Tomasz Pulajew (FORT POLSKA Sp. z o.o. ) for structure; Pedro Cerdá for acoustics
Collaborators for design stage (in Poland): ELSECO Sp. z o.o. for electricity; Iskierski Mariusz. Biuro Inżynierskie for HVAC Systems, Plumbing, Telecommunications; Pracownia Architektury i Urbanistyki SEMI  for urban planning
Constructor: Mostostal Warszawa S.A., Acciona Infrastruktura S.A.
Provider reclaimed bricks: Ceramsus
Provider concrete: CEMEX Polska. The supplier of concrete and provider of concrete solutions and recipes is CEMEX Poland who worked closely with Fernando Menis to fullfill his requirements for the project

Extra info

Location:
Toruń, Poland

Dates:
2008 Competition; 2011 Design; 2013-2015: Construction

Program:
Cultural

Plot m2:
46,971 m2

Built:
21,837 m2

Cost:
51,025,731 Euros

Structure:
Reinforced concrete and steel

Materials:
Concrete and recycled red brick